END USER | PROJECT | SCOPE OF WORK | YEAR |
---|---|---|---|
ENI OIL CO. | MELLITAH OIL & GAS | WHEELED PRESSURIZE MONNEX DRY POWDER EXTINGUISHERS 30KG, PORTABLE PRESSURIZE MONNEX DRY POWDER EXTINGUISHERS 12KG, PORTABLE PRESSURIZE MONNEX DRY POWDER 2KG | 2017 |
AZZAWIYA OIL REFINING COMPANY INC. | AZZAWIYA OIL REFINERY | FIRE HOSES | 2016 |
BREGA PETROLEUM MARKETING CO. | OIL TERMINALS | FIRE HOSES | 2014 |
GENERAL ELECTRIC COMPANY OF LIBYA (GECOL | ZWITINA | HYDRANTS, HOSE CABINETS, POST INDICATOR VALVES, DELUGE VALVES, TAMPER SWITCHES, OS&Y GATE VALVES, MULTIPLE JET CONTROLS, NOZZLES, SPRINKLERS, FIRE DEPT. INLET CONNECTIONS, EXTINGUISHERS, ALARM CHECK VALVES, Y STRAINERS, CHECK VALVES, GLOBE VALVES | 2014 |
ZAWIYA OIL REFINERY COMPANY | OIL REFINERY | DELUGE VALVE ASSEMBLY | 2013 |
MELLITAH OIL & GAS | WAFA | SPARE PARTS FOR HIGH PRESSURE MCH-13 & MCH-6 COMPRESSORS | 2013 |
ENI OIL CO. | MELLITAH OIL | FIRE FIGHTING EQUIPMENT | 2013 |
LIBYAN TOBACCO COMPANY | GTC | SPARE PARTS FOR FIRE DETECTION SYSTEM | 2012 |
MELLITAH OIL CO. | WAFA | CO2 SYSTEM | 2010 |
AKAKUS OIL OPERATIONS | PHASE II EL SHARARA FIELDS | SPRAY NOZZLES | 2010 |
J&P ENERGY & INDUSTRIAL PROJECTS S.A. for WAHA OIL CO | FAREGH PHASE 2 | FIRE FIGHTING EQUIPMENT | 2010 |
PSM for WAHA OIL CO | FAREGH PHASE 2 | SAFETY EQUIPMENT | 2009 |
LIBYAN TOBACCO COMPANY | GTC | SPARE PARTS | 2009 |